greg@foy.com |
|
Jan 81 - Present |
Logicon,Inc.-a Northrop Grumman
Corporation |
|
|
Jun 97 - Present |
Manager, Central Region for Professional Services | |
|
|
Manage multiple project. Provide
technical guidance to address enterprise-wide business
process improvement and information system planning.
Projects include: 1) US Air Force Material Command/Material Systems Group (AFMC/MSG). Northrop Grumman is supporting the MSG/SW organization in the Year 2000 readiness review and evaluation of the renovators/developers test cases and test case results focused on traceability of test results to test cases and traceability of test/cases/results to requirements 2) US Air Force Material Command/LG (AFMC/LG). Northrop Grumman is supporting the FMD organization in the review of a government -off-the-shelf (GOTS) financial package. Northrop Grumman personnel are assisting in the definition of additional functional requirements and the interface requirements necessary to implement the DIFMS system. |
|
|
|
||
|
Apr 99 - Jan 2000 |
Department of the Interior (DOI), Office of Information Resource Management (OIRM). Assessing the Year 2000 readiness of 50 mission critical and business necessary systems at 30 locations nation-wide. Systems included dam sensor systems, world wide seismographic systems, national weather systems, hydroelectric power plants, financial systems, natural resource management systems, and emergency response systems. Technologies included: main frame, distributed, web based, platforms and communications with satellite and network links. | |
|
|
||
|
Jan 99 - Apr 99 |
US Army Corps of Engineers, San Francisco District. Assessing the Year 2000 readiness at dams,
hydroelectric power plants, and fish hatcheries. |
|
|
|
||
|
May 97 - Jun 98 |
Program Manager for the Joint Logistics Systems Center Depot Maintenance Directorate (JLSC/DM) | |
|
|
Task Order for: 1) Customization of a commercial software package (Maximo by PSDI) to satisfy the requirements of Marine Corps Logistics Centers and Naval Avionics Depot environments; 2) Integration/interface the Western Data Systems Manufacturing Resource Planning (MRP) software into the Naval Avionics Depot; and, development of the Depot Maintenance System (DMS). 3) Developed custom distributed contract management system to support inter-service repair of major commodities. This application was developed using RAAD development techniques and using the Cool:Gen (by Sterling Software) development tool set. The tool set was used to capture the requirements and design, support rapid prototyping of user interfaces and the generate application code. Organized and managed an integrated team of 120 information system technicians, maintenance/manufacturing specialists, and logisticians. I represented the prime contractor, BDM Enterprise Integration Systems, Inc., as their overall project manager and supervised all BDM personnel and 10 subcontractors. Provided technical guidance to address enterprise wide-business process improvement and information system architectural planning. This $13M cost plus award fee contract earned an "excellent" rating from the government client and was awarded 90% of the available award fee pool. |
|
|
|
||
|
Mar 94 - May 97 |
Program Manager for the Joint Logistics Systems Center Depot Maintenance Directorate (JLSC/DM) | |
|
|
Task Order for integration and development of the Depot Maintenance System. Organized and managed an integrated team of 180 information system technicians, maintenance/manufacturing specialists, and logisticians. I represented the prime contractor, BDM Enterprise Integration Systems, Inc., as their overall project manager and supervised all BDM personnel and 10 subcontractors. Provided technical guidance to address enterprise wide business process improvement and information system architectural planning. Project value $62M with 36 months period of performance. Project completed 7% under budget qnd 3% over schedule. | |
|
|
||
|
Oct 92 - Feb 94 |
Engineering Manager
for the United Kingdom Royal Air Force (RAF) Logistics
Information Technology Strategy (LITS) Prime Systems
Integrator Project |
|
|
|
Reported to the Program Manager. Established the site office and managed the engineering efforts for this London based proposal. Leaded a consortium staff of 30 technicians and logisticians to produce the design of applications and technical infrastructure to support RAF aircraft operations, logistics support, and maintenance at over 80 air stations/depots world-wide. Conducted extensive product evaluation of available commercial-off-the-shelf (COTS) products to satisfy functional and data requirements for aircraft operation, maintenance, and depot overhaul. The study included existing commercial airline systems, military systems, preventive maintenance systems, asset management systems, manufacturing systems, and repair/overhaul systems. Introduced the Northrop Grumman proposal development methodology across the consortium team. Prepared and delivered the technical portion of the oral presentation of the proposal. | |
|
|
||
|
Jun 92 - Oct 92 |
Program Manager for
Republic of Singapore Navy Logistics Management
Information System (LMIS) |
|
|
|
Reported to Director of International Programs. Managed this Singapore based proposal program, developed teaming agreements with companies based in Israel, Singapore and the United States, coordinated the technical solution, lead the preparation of the technical and cost proposal, prepared and delivered the oral presentation of the proposal. | |
|
|
||
|
May 87 - Jun 92 |
Deputy Engineering
Manager for the U.S. Air Force Repair Depot Maintenance
Management Information Systems (DMMIS) project |
|
|
|
Reported to the Program/Engineering Manager. Established the project office in Dayton, OH. The DMMIS systems replaced and functionally integrated 35 existing data systems. Provided leadership to formulating the business concept of operation from proposal to implementation. Lead initiatives to standardize business process re-engineering techniques, development methodologies, documentation development processes and to provide for a continuous process improvement philosophy. Project was independently certified as SEI Level 3. Engineering methodology was supported by IEF tool set (currently marketed as Coolgen by Sterling Software. | |
|
|
||
|
May 86 - May 87 |
Engineering Manager
for the U.S. Navy Rapid Acquisition of Manufactured
Parts (RAMP) project |
|
|
|
Reported to the Program Manager. Established a new DSSD engineering office in Charleston, SC as part of a consortium tasked to develop two state-of-the-art computer integrated factories for the rapid (30 days from requirement identification) manufacture of items not commercially available. Managed the requirements definition and analysis phase of the project, selected methodology and CASE tools. | |
|
|
||
|
Jan 81 - May 86 |
Grumman Aerospace Division |
|
|
Aug 84 - May 86 |
Software Manager for
U.S. Air Force Advanced Avionics Systems
project |
|
|
|
Responsible for systems definition and design of the avionics and flight control systems software for the Advanced Tactical Fighter aircraft. | |
|
|
||
|
Oct 83 - Aug 84 |
Group Leader |
|
|
|
Assigned as Engineering Manager of an international team to produce the preliminary design for a distributed shipboard machinery control system for destroyer (DDG51 class) vessels. | |
|
|
||
|
Spt 82 - Oct 83 |
Group Leader |
|
|
|
Responsible for proposing and executing various avionics upgrade programs for the A-6 (Intruder) aircraft and weapons systems. | |
|
|
||
|
Jan 81 - Spt 82 |
Senior
Programmer |
|
|
|
Responsible for development, proposal through implementation, of interactive computer integrated training devices for the training of maintenance personnel through simulations. These systems included: simulations of actual equipment, video presentations to students, and touch sensitive input panels. | |
|
|
||
|
Jun 78 - Jan 81 |
Bobst Graphics Inc. |
|
|
Jun 78 - Jan 81 |
Programmer/Analyst |
|
|
|
Programmer and programmer/analyst supporting the development and support of high quality type setting work stations. | |
|
|
| Jun 1977 |
M.A. in Mathematics Major: Group Theory St. John's University, Jamaica, NY GPA: 3.00 |
| Jun 1972 |
B.S. in Mathematics Major: Group Theory St. John's University, Jamaica, NY Overall GPA: 4.00; Major GPA: 3.96 Ranked First in Major Class |
| 1993 |
Project Management with PRINCE |
| 1992 |
Work Process Management |
|
| 1990 |
Total Quality Improvement Systems |
|
| 1989 |
Basic Project Management |
|
| 1984 |
Aircraft Combat Survivability |
|
| 1984 |
Real Time ADA |
|
| 1984 |
Advanced ADA Tasking |
|
| 1984 |
ADA Software Acquisition |
|
| 1984 |
Software Cost Estimating |
|
| 1983 |
ADA Programming |
|
| 1981 |
Structured Programming |
|
| 1980 |
Software Engineering Management
Techniques |
| April 1994 |
in the Proceedings of the Software
Technology Conference |
|
| May 1983 |
Distributed Microprocessor Systems
Architecture for Implementing Maintenance Trainers
with 3-D Simulation in the Proceedings of the
National Aerospace Engineering Conference
(NAECON) |
|
Jun 77 - Jan 81 |
Hofstra University,
Associate Professor in Department of Computer
Science |
|
| Taught undergraduate courses in data structures, assembly language, high level programming languages, such as, ADA and BASIC. | ||
|
|
|
|
|
Spt 73 - Jun 78 |
St. Paul's
School |
|
| Mathematics department head and mathematics teacher at this small suburban boarding school. Taught geometry and algebra to 10th and 12th year students. Coached track and cross country. | ||
|
|
|
|
|
Sep 71 - Spt 73 |
Bishop Ford High
School |
|
|
Taught algebra and geometry to 9th and
10th grader students at this mid size
urban school. Moderated the dance committee. |
||
|
|
|
|
|
Spt 69 - Spt 71 |
St. Agatha's
School |
|
| Taught arithmetic and reading to 7th and 8th grader students at this mid size urban school. | ||
|
|
|